DATA CENTER BER 12
Design and installation of HILTI steel substructure for Kingpsan TATE system Installation of Kingspan TATE modular ceiling – 7600 m2 Installation of plasterboard walls and painting – 3300 m2 Finishing work of office space
Design and installation of HILTI steel substructure for Kingpsan TATE system Installation of Kingspan TATE modular ceiling – 7600 m2 Installation of plasterboard walls and painting – 3300 m2 Finishing work of office space
Design and installation of HILTI steel substructure for Kingpsan TATE system Installation of Kingspan TATE Grid modular ceiling – 2500m2
Gypsum boards Plastering Painting Dismantling of gypsum board ceilings Door removal
Gypsum boards Plastering Forming holes for installations Painting Wall finishing
3-stage quality check system 8 level of maintenance according to ISO 14644-1 Installation of Kingspan sandwich panels Design and installation of SIKLA® steel substructure from Kingpsan Tate system Installation of Kingspan Tate Grid modular ceiling – 1750m2 Installation of plasterboard walls and painting- 4000m2
Supply and installation of Domoferm steel doors with different degrees of fire resistance 3-stage quality check system 8 level of maintenance according to ISO 14644-1 Installation of Kingspan sandwich panels Design and installation of SIKLA® steel substructure from Kingpsan Tate system Installation of Kingspan Tate Grid modular ceiling – 1400m2 Installation of plasterboard walls and…
Supply and installation of RC4 steel burglar-proof doors made by Donimet with different degrees of fire resistance 3-stage quality check system 8 level of maintenance according to ISO 14644-1 Drilling with diamond technology Installation of plasterboard ceilings on a steel cross substructure Finishing reinforced concrete and masonry walls with plasterboard on a hat structure
Supply and installation of RC4 steel burglar-proof doors made by Donimet with various degrees of fire resistance 3-stage quality check system 8 level of maintenance according to ISO 14644-1 Drilling with diamond technology Kingspan sandwich panel repair Installation of a plasterboard ceiling on a steel structure Comprehensive Fit-Out of the office part
3-stage quality check system Design and installation of SIKLA® steel substructure from Kingpsan Tate system Installation of Kingspan Tate Grid modular ceiling – 3800m2
Supply and installation of Mercor steel doors with different degrees of fire resistance Supply and installation of stoneware, tiles and carpeting 3-stage quality check system Supply and installation of revolving portals Installation of anti-intrusion walls Protection of mechanical and electrical fire passages Installation of plasterboard walls and painting Installation of plaster and mineral ceilings